A brand-new, state-of-the-art jumbo drill has been delivered to our Eloise Mine Complex project following the recent award of a new four-year contract by our client, AIC Mines.
PYBAR’s new Sandvik DD422i Dual Control Jumbo, a major advancement in technology from previous models, is designed for multitask drilling, bolting and meshing with the benefit of an electronic controlled intelligent drilling system. The electronic torque control drilling delivers accuracy, improved consumable life and faster consistent boring.
With operator safety, comfort and ease of use the main focus in this game-changing machine redesign, the new jumbo is impressing everyone on site at Eloise. The improved drilling performance, drastically reduced noise levels and improved drilling visibility for operator safety is consistently delivering outstanding results for PYBAR’s Eloise project.
