CONTRACT TYPE Schedule of rates PROJECT STATISTICS Initial 9 month development contract of 3,066m KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders
CONTRACT TYPE Schedule of rates PROJECT STATISTICS Initial 9 month development contract of 3,066m KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders
SCOPE Rehabilitation of old work areas CONTRACT TYPE Fixed PROJECT STATISTICS Project Term: 5 months initially KEY MILESTONES (to date) Injury free to date KEY PLANT & EQUIPMENT 1 x Sandvik DD421 Jumbo
SCOPE Development – 1,600 metres of level and decline development Production – 1.6M tonnes of stope ore trucked to surface ROM CONTRACT TYPE Fixed and variable PROJECT STATISTICS Project Term: 30 months Employees: 60 at peak KEY MILESTONES (to date) Commencement: 1 January 2021 At completion of the development metres, Black Rock mine will be […]
SCOPE 8796 metres of decline, incline, and level development CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project term: 24 months Employees: 60+ at peak production KEY MILESTONES (to date) Commencement 1 July 2019 Hamlet North will be developed from the Hamlet decline 2019 to 2021 Hamlet underground to operate concurrently in 2019 KEY PLANT AND […]
SCOPE Portal development Decline development Level development Diamond drilling CONTRACT TYPE Schedule of rates PROJECT STATISTICS Project term: 12 months Employees: 37 PROJECT KEY OUTCOMES (to date) Develop portal face, exploration decline, level development, and diamond drilling over a 12 month contract period KEY MILESTONES (to date) Project commenced: 1 March, 2019 KEY PLANT & EQUIPMENT 1 […]
SCOPE Raise bore services for ventilation shafts from 100 to 500m and up to diameters of 5.5m diameter Shaft lining services as required CONTRACT TYPE Fixed and Variable / Schedule of Rates PROJECT STATISTICS Project term: ongoing KEY PLANT & EQUIPMENT 3 x raise bores: RBR600, RBR400, SBM800, SBM450
SCOPE Box cut excavation of Far West portal via drill and blast methods managing a two subcontractor Ground support of box cut with shotcrete and jumbo with PYBAR employees and equipment CONTRACT TYPE Fixed and variable PROJECT STATISTICS Project Term: 1-2 Months Employees: <16 people KEY MILESTONES (to date) Firing of the box cut completed […]
SCOPE Underground decline and level development including rehab, primary development, drive stripping and shotcreting. CONTRACT TYPE Fixed and variable. PROJECT STATISTICS Project Term: 24 months Employees: 43 at peak KEY MILESTONES (to date) Pending mobilisation. KEY PLANT & EQUIPMENT 1 x Jumbo – Sandvik DD420-60; 1 x Loader – Cat R2900G; 2 x Trucks – […]
SCOPE Early works, site establishment, rehab, development and production mining, raise boring and diamond drilling CONTRACT TYPE Schedule of rates with proportion of fixed PROJECT STATISTICS Project Term: 48 months Employees: 120 at peak KEY MILESTONES (to date) Pending mobilisation KEY PLANT & EQUIPMENT 2 x Jumbo – Sandvik DD421 1 x Production Drill – […]
SCOPE Mine development; Production drilling and blasting; Loading and hauling of ore and waste; and Backfill – CRF. CONTRACT TYPE Schedule of Rates. PROJECT STATISTICS Project Term: 7 years Employees: 70 at peak production KEY MILESTONES (to date) First firing of box cut on 16 May 2018 (prior surface development contract); First decline cuts completed […]