Black Rock – 2021

Posted · Add Comment
Black Rock Project

Black Rock – 2021

Location
Mount Isa, QLD
Client
Glencore
Commodity
Copper/ Lead Zinc

SCOPE

  • Development – 1,600 metres of level and decline development
  • Production – 1.6M tonnes of stope ore trucked to surface ROM

CONTRACT TYPE

  • Fixed and variable

PROJECT STATISTICS

  • Project Term: 30 months
  • Employees: 60 at peak

KEY MILESTONES (to date)

  • Commencement: 1 January 2021
  • At completion of the development metres, Black Rock mine will be connected with the main mine

KEY PLANT AND EQUIPMENT

  • 1 x 432i Production Drill
  • 1 x 421 Sandvik Twin Boom Jumbo
  • 2 x R2900 Underground Loaders
  • 2 x AD60 Underground Truck
  • 1 x Normet Charmec Charge Unit
  • 1 x Volvo L120 IT
  • 1 x Normet Spraymec
  • 1 x Normet AGI

Comments are closed.

 

Newsletter Signup

  • This field is for validation purposes and should be left unchanged.
 

Do not remove this

NEWSLETTER SIGNUP

  • This field is for validation purposes and should be left unchanged.
Website By: 121 Group