Black Rock – 2021
Location: Mount Isa, QLD
Client: Glencore
Commodity: Copper/ Lead Zinc
SCOPE
- Development – 1,600 metres of level and decline development
- Production – 1.6M tonnes of stope ore trucked to surface ROM
CONTRACT TYPE
- Fixed and variable
PROJECT STATISTICS
- Project Term: 30 months
- Employees: 60 at peak
KEY MILESTONES (to date)
- Commencement: 1 January 2021
- At completion of the development metres, Black Rock mine will be connected with the main mine
KEY PLANT AND EQUIPMENT
- 1 x 432i Production Drill
- 1 x 421 Sandvik Twin Boom Jumbo
- 2 x R2900 Underground Loaders
- 2 x AD60 Underground Truck
- 1 x Normet Charmec Charge Unit
- 1 x Volvo L120 IT
- 1 x Normet Spraymec
- 1 x Normet AGI