Carrapateena Mine

Location: 165km North of Port Augusta, Pernatty Station, SA

Client: BHP

Commodity: Copper and gold

Contract scope: Raise bore services includes 750mm slots drilling and ventilation shafts ranging from 3.0m to 6.0m in diameter up to 500m in length Shaft lining services as required

Project statistics: As part of the ongoing works at Carrapateena Mine, an additional primary ventilation capacity is required for the block cave works. The works includes shafts ranging from 3.0m to 6.0m in diameter up to 500m in length Production slot raises 750mm in diameter up to 35m in length Key milestones (to date): Ongoing project

Key plant & equipment: Easer, RB40, SBM800, SBM900, RBR400VF, RBR600VF, RSL1000 Shaftlining rig

NEWSLETTER SIGNUP

Secret Link