
George Fisher Mine
Location: Mount Isa, QLD
Client: Glencore
Commodity: Zinc, lead, silver
Contract scope: part of the additional primary ventilation capacity required
Project statistics: Multiple large diameter raise bore shafts ranging from 2.4m diameter to 4.0m diameter totalling 2096.719m Shaftlining ranging from 3.5 diameter to 4.5m in diameter Key milestones (to date): Works completed in November 2023
Key plant & equipment: SBM900 raise bore rig, RSL1000 Shaftlining rig
