Homestead – 2009

Posted · Add Comment

Homestead – 2009

Location
Kalgoorlie, WA
Client
Norton Goldfields
Commodity
Gold

SCOPE

  • The scope of work for the Homestead Decline is to cut the portal and develop parallel declines (the second being a return air decline) and associated stockpile areas as the first phase to gaining access to the Homestead ore body.; and
  • A total of 2,900 metres of rapid development is required to achieve this. The project employs locally based personnel with the aim of establishing a presence within the local community and the wining of future works at Homestead.

CONTRACT TYPE

  • Fixed and variable contract.

PROJECT STATISTICS

  • Project Term: Ongoing.

KEY PROJECT OUTCOME

  • Delivered the project scope on time & on budget; and
  • Met or exceeded the clients KPI’s, outcomes and expectations.

KEY MILESTONES

  • Project Commencement: April 2009.

KEY PLANT AND EQUIPMENT

  • 2 x Tamrock Axera 7-260;
  • 2 x Toro 0010 Loaders;
  • 1 x Toro 0011 Loaders;
  • 2 x Toro 50+ Dump Truck;
  • 1 x Normet Charmec 1610B;
  • 1 x Volvo L90E Wheel Loader; and
  • 8 x Light Vehicles. 

 

Comments are closed.

 

Newsletter Signup

  • This field is for validation purposes and should be left unchanged.
 

Do not remove this

NEWSLETTER SIGNUP

  • This field is for validation purposes and should be left unchanged.
Website By: 121 Group