Ballarat Goldfields – 2004

Posted · Add Comment

Ballarat Goldfields – 2004

Location
Ballarat, VIC
Client
Ballarat Gold Mine
Commodity
Gold

SCOPE

  • Provision of skilled labour, plant, supervision and project management to including all decline and level development, ore production and extensive ground support installation including spiling, in-cycle fibrecrete and cable bolting; and
  • Supply of all consumables.

CONTRACT TYPE

  • A partnering / alliance contract with PYBAR providing the project management, supervisors, trainers, operators, plant and equipment; and
  • PYBAR worked closely with the client team onsite on a fixed and variable type contract with margin linked to proactive safety, quality and productivity KPIs.

PROJECT STATISTICS

  • Project Term: 42 months
  • Employees: 200

KEY PROJECT OUTCOMES

  • Complete project management as the principal contractor;
  • Successful partnership/alliance contract linked to KPIs of proactive safety, quality and productivity; and
  • Productive integration of PYBAR management team with client team on site.

KEY MILESTONES

  • Project commenced: November 2004 
  • Project completed: June 2008

KEY PLANT & EQUIPMENT

  • 2 x Jumbos – Tamrock Axera 7-260;
  • 1 x Jumbo – Tamrock Axera 5-140;
  • 1 x Production Drill – Tamrock Solo 5-5V;
  • 4 x Loaders – Toro 1400, Toro 006, Toro 0010;
  • 5 x Dump & Ejector Trucks – Cat / Toro;
  • 2 x Shotcrete Rigs – Jacon Maxijet & Midjet;
  • 4 x Integrated tool carrier Loaders – Volvo from L50E to L120E size;
  • 1 x Grader – Cat 12G; and
  • 1 x Charge Up Unit – Normet 1610B. 

Comments are closed.

 

Newsletter Signup

  • This field is for validation purposes and should be left unchanged.
 

Do not remove this

NEWSLETTER SIGNUP

  • This field is for validation purposes and should be left unchanged.
Website By: 121 Group