RBR600 – VF Raise Bore

Our new raise bore rig – the second largest in Australia!

January 15, 2015
Raise Boring, Whole of Mine


Mobile Raise Boring Unit – Video

Watch PYBAR’s new independently mobile raisebore transporter show its moves on this new

November 26, 2013
Raise Boring, Whole of Mine


PYBAR expands service offer

PYBAR group recently purchased two raisebores and an exploration drilling company, two steps closer to confirming its position as an end to end supplier of quality mining contracting services

November 1, 2013
Exploration Drilling, Mine Development, Mine Production, Whole of Mine


New Cabolter at CSA

PYBAR Mining have recently commissioned a new Sandvik DS421 into CSA Mine at Cobar, NSW. This is one of PYBAR’s largest investments and brings the fleet replacement value to $112M with over 370 pieces of equipment. This machine is designed especially for rock reinforcement in underground mines and tunnels with…

April 29, 2013
Cable Bolting, Mine Development


Shotcrete stability at Mineral Hill

A recent review by geotechnical engineers engaged by KBL on poor ground conditions in a critical decline development at the Mineral Hill Mine resulted in the recommendation to shotcrete the decline to ensure long term access.

March 19, 2013
Mine Development, Shotcrete Rig, Shotcreting


Hera Mine update

Work is progressing well with PYBAR’s YTC Hera project at Nymagee, NSW.

February 1, 2013
Mine Development, Mine Production, New South Wales, Whole of Mine


New DS421 Cablebolter available for hire

PYBAR has available a new DS421 cabin cablebolter for contract projects – this equipment comes complete with operators and a maintenance program.

January 30, 2013
Cable Bolting, Mine Development


Raise boring that’s on the move

PYBAR has recognised raise boring as a complementary component of its underground service, with raise boring offering important advantages over conventional methods. This new division includes a Redbore 50 MDUR (capable of box hole or conventional raise boring) and a fully mobile Redbore 40 with its own engineered and certified…

January 11, 2013
Raise Boring, Whole of Mine


Shotcreting – from mining to civil

PYBAR has been contracted by John Holland to supply a Jacon Maxijet robotic shotcrete rig with experienced operator/nozzleman for the Hume Highway underpass of Sydney’s Glenfield to Leppington Rail Line project.

November 26, 2012
Mine Development, Shotcrete Rig, Shotcreting


Mineral Hill to go deeper

KBL Mining Limited has confirmed a new copper-gold lode directly below the current development of the Parkers Hill ore body at the Mineral Hill Mine in NSW.

September 25, 2012
Exploration Drilling, Mine Development, Mine Production, New South Wales, Whole of Mine


 

Newsletter Signup

  • This field is for validation purposes and should be left unchanged.
 

Do not remove this

NEWSLETTER SIGNUP

  • This field is for validation purposes and should be left unchanged.
Website By: 121 Group