Hamlet North – 2019

Posted · Add Comment

SCOPE 8796 metres of decline, incline, and level development CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project term: 24 months Employees: 60+ at peak production KEY MILESTONES (to date) Commencement 1 July 2019 Hamlet North will be developed from the Hamlet decline 2019 to 2021 Hamlet underground to operate concurrently in 2019 KEY PLANT AND […]

Woodlawn – 2018

Posted · Add Comment

SCOPE Early works, site establishment, rehab, development and production mining, raise boring and diamond drilling  CONTRACT TYPE Schedule of rates with proportion of fixed PROJECT STATISTICS Project Term: 48 months Employees: 120 at peak KEY MILESTONES (to date) Pending mobilisation KEY PLANT & EQUIPMENT 2 x Jumbo – Sandvik DD421 1 x Production Drill – […]

Capricorn Copper – 2017

Posted · Add Comment

SCOPE OF WORKS Surface vent shaft 2.4m x 357m in length  CONTRACT TYPE Schedule of rates  PROJECT STATISTICS Start date: 1 September 2017 Term: three months Employees: six  KEY PLANT & EQUIPMENT 1 x raise bore: SBM800

Mt Lyell – 2017

Posted · Add Comment

SCOPE Rehabilitation of the Prince Lyell Decline CONTRACT TYPE Fixed Price PROJECT STATISTICS 2,275m3 of Fibrecrete 8,900 Resin Bolts 500 Cabebolts KEY MILESTONES (to date) Pending mobilisation – 3 month scope of work KEY PLANT & EQUIPMENT 1x DD420 Jumbo 1x Jacon – Combo unit shotcrete/Agi 1x Volvo Wheel Loader L120 IT

Peak Gold Mine – 2017

Posted · Add Comment

SCOPE 60 Months Contract consisting of 29,521m development, 520,060m production drilling, 2.9mt of production bogging, 2mt of waste rock fill and 173kt cemented rock fill. Total of 19.8 million trucking TKM. CONTRACT TYPE Schedule of Rates  PROJECT STATISTICS Active Project term: 60 Months Employees: 150+  KEY PROJECT OUTCOMES (to date) Development and production of Peak […]

Costerfield – 2017

Posted · Add Comment

SCOPE  Additional Capital Development CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project Term: 3 months; and Employees: 25 KEY PROJECT OUTCOMES Extend the 4800 decline to access additional ore, an additional 342m of development. KEY MILESTONES Project completed; Commenced in Mar 2017; and 367m of advance.  KEY PLANT & EQUIPMENT 1 x Jumbo – Sandvik […]

Henty Gold Mine – 2016

Posted · Add Comment

SCOPE Length of Mine Development and Stoping CONTRACT TYPE Cost Plus PROJECT STATISTICS Active; Project term: LOM; and Employees: 130. KEY PROJECT OUTCOMES (to date) Ongoing Contract KEY MILESTONES (to date) Recommenced operations; and First Gold Pour – January 2017. KEY PLANT & EQUIPMENT 2x Jumbos – Atlas Copco H282 and Atlas Copco H104; 1x […]

Carrapateena – 2016

Posted · Add Comment

SCOPE Early Works Program – 7.5km of initial decline development; and Revision to mine design now twin decline access to orebody. CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project term: 36 months Employees: 120 KEY PROJECT OUTCOMES Site mobilization in August 2016; Boxcut and portal establishment by September 2016; and Developed over 1km of 1:7 […]

Costerfield Muki Micro Combo Drill Trial – 2016

Posted · Add Comment

SCOPE PYBAR’s Drilling Division was contracted to provide narrow vein development drilling utilising the Muki Micro Combo Drill.; An initial 3 month trial consisted mainly of 1.8m x 3m development drilling along with a trial of the bolting and production drilling capabilities of the Muki Micro Combo Drill.; and PYBAR manning consisted of one Project […]

Matilda – 2016

Posted · Add Comment

SCOPE Mine development and stoping CONTRACT TYPE Schedule of rates PROJECT STATISTICS Employees: 107 KEY PROJECT OUTCOMES  Commenced Development in August 2016; 9 km of advance; 5,000 production drill metres; 48,000 t of ore mined; and 951,000tkm’s hauled.  KEY PLANT & EQUIPMENT (at peak) 3 x Jumbos – Sandvik DD420-60 -TFX 8/14, Sandvik 7-260  – […]

 