CONTRACT TYPE Schedule of rates PROJECT STATISTICS Initial 9 month development contract of 3,066m KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders
CONTRACT TYPE Schedule of rates PROJECT STATISTICS Initial 9 month development contract of 3,066m KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders
SCOPE 8796 metres of decline, incline, and level development CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project term: 24 months Employees: 60+ at peak production KEY MILESTONES (to date) Commencement 1 July 2019 Hamlet North will be developed from the Hamlet decline 2019 to 2021 Hamlet underground to operate concurrently in 2019 KEY PLANT AND […]
The Glencore-owned Lady Loretta project is an underground zinc-lead-silver mine located near Mt Isa in north west Queensland. PYBAR was commissioned at the greenfields infrastructure project in 2011 to provide services ranging from portal establishment to point of readiness for mine production. Production had been scheduled to commence in September 2013 with a production rate […]
Aurelia Metals’ Hera underground mine is a high grade gold and base metal project located in western New South Wales. The deposits represent typical “Cobar Style” ore systems, which have a strong historical precedent for large scale, high-grade, long life mining operations. Like most underground mines in Australia, Hera is accessed by a single decline […]
The Osborne-Starra copper-gold mining complex is among the top 20 largest metalliferous underground mines in Australia by tonnes of ore mined. It was also one of the top three largest mining operations in the country to contract out all or the majority of their mining functions. Production concluded in 2015 as the mine reached end […]
Safe and efficient underground mine development services with a focus on rapid project delivery for early commencement of production.
PYBAR’s scope of works at Glencore’s CSA copper mine in New South Wales encompassed mine development and intensive ground support regimes (up to four passes), load and haul of development waste to stope fill areas, and loading of development ore into client trucks as required. The CSA mine is at a depth of 1300m and […]
SCOPE Portal development Decline development Level development Diamond drilling CONTRACT TYPE Schedule of rates PROJECT STATISTICS Project term: 12 months Employees: 37 PROJECT KEY OUTCOMES (to date) Develop portal face, exploration decline, level development, and diamond drilling over a 12 month contract period KEY MILESTONES (to date) Project commenced: 1 March, 2019 KEY PLANT & EQUIPMENT 1 […]
SCOPE Box cut excavation of Far West portal via drill and blast methods managing a two subcontractor Ground support of box cut with shotcrete and jumbo with PYBAR employees and equipment CONTRACT TYPE Fixed and variable PROJECT STATISTICS Project Term: 1-2 Months Employees: <16 people KEY MILESTONES (to date) Firing of the box cut completed […]
SCOPE Underground decline and level development including rehab, primary development, drive stripping and shotcreting. CONTRACT TYPE Fixed and variable. PROJECT STATISTICS Project Term: 24 months Employees: 43 at peak KEY MILESTONES (to date) Pending mobilisation. KEY PLANT & EQUIPMENT 1 x Jumbo – Sandvik DD420-60; 1 x Loader – Cat R2900G; 2 x Trucks – […]