Carrapateena Mine

Posted · Add Comment

Contract scope: Raise bore services includes 750mm slots drilling and ventilation shafts ranging from 3.0m to 6.0m in diameter up to 500m in length Shaft lining services as required Project statistics: As part of the ongoing works at Carrapateena Mine, an additional primary ventilation capacity is required for the block cave works. The works includes […]

Eloise Copper

Posted · Add Comment

Contract scope: As part of mining services, a range of small diameter shafts and service holes are required. Project statistics: Small 750mm diameter slots and 1.1m diameter escape ways with rising main holes. Key milestones (to date): Ongoing project Key plant & equipment: RB40, SBM450 raise bore rigs

Kidston Pumped Storage Hydro

Posted · Add Comment

Contract scope: Four raise bore shafts – two 4m diameter and two 5m diameter – totalling 970m (one cable shaft, one ventilation shaft, two intake shafts) Project statistics: First pumped hydro project in Australia for 40 years, 250MW of reliable energy for up to eight hours – enough for 100,000 homes, third largest electricity storage […]

Federation

Posted · Add Comment

Contract scope: Detailed design, provision of all necessary materials, equipment and personnel to construct three raise bore shafts, including shaftlining. Project statistics: Raise bore works – three raise bore shafts – one 2.4m diameter, one 4.5m diameter one 5.0m diameter totalling 270.109m (one escape way, one RAR ventilation shaft, FAR ventilation shaft) Shaftlining works – […]

Peak

Posted · Add Comment

Contract type: Schedule of rates Contract scope: All underground mining activities from development through to ore production and haulage at both the North and South mines. Project statistics: Development metres: 29,521, Production metres: 541,405, Ore tonnes: 3,588,208 Key milestones (to date): Developed Kiaros high grade ore body. 2019, completed 2022 Key plant & equipment: 3 […]

Maxwell Drift Development

Posted · Add Comment

Contract type: Alliance Contract scope: Twin development declines – 1,227 transport drive, 1,227 conveyor drive Project statistics: Project commenced 2023, ongoing Key milestones (to date): Introducing hard rock drill and blast development methodology to a coal mine. Key plant & equipment: 2 x DD420 Sandvik twin boom jumbos – fully converted from diesel operation to full […]

Savage River

Posted · Add Comment

Contract scope: Development of exploration decline and lateral development roadways at an existing open cut operation. Project statistics: Key milestones (to date): Project commenced early 2024, ongoing Key plant & equipment: Sandvik DD421 jumbo, Cat R2900G loader, Cat AD60 truck, Jacon Maxijet shotcreter, Elphinstone WR820 agi

Rosebery

Posted · Add Comment

Contract Scope: Supply, delivery and application of fibrecrete and cement rock fill (CRF) Project statistics: Three-year contract with two one-year extension options Key milestones (to date): Project commenced 2023, ongoing Key plant & equipment: 2 x Jacon spray rigs, permanent batch plant, 3 x Elphinstone Cat WR820 agis

Eloise Copper Mine

Eloise – 2020

Posted · Add Comment

 CONTRACT TYPE Schedule of rates  PROJECT STATISTICS Initial 9 month development contract of 3,066m  KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders

 

Newsletter Signup

  • This field is for validation purposes and should be left unchanged.
 

Do not remove this

NEWSLETTER SIGNUP

  • This field is for validation purposes and should be left unchanged.
Website By: 121 Group