Savage River

Posted · Add Comment

Contract scope: Development of exploration decline and lateral development roadways at an existing open cut operation. Project statistics: Key milestones (to date): Project commenced early 2024, ongoing Key plant & equipment: Sandvik DD421 jumbo, Cat R2900G loader, Cat AD60 truck, Jacon Maxijet shotcreter, Elphinstone WR820 agi

Avebury Nickel Mine

Posted · Add Comment

Contract scope: Production drill, operators and maintenance personnel Project statistics: Key milestones (to date): Project commenced/ completed 2023 Key plant & equipment: Production drill

Rosebery

Posted · Add Comment

Contract Scope: Supply, delivery and application of fibrecrete and cement rock fill (CRF) Project statistics: Three-year contract with two one-year extension options Key milestones (to date): Project commenced 2023, ongoing Key plant & equipment: 2 x Jacon spray rigs, permanent batch plant, 3 x Elphinstone Cat WR820 agis

Eloise Copper Mine

Eloise – 2020

Posted · Add Comment

 CONTRACT TYPE Schedule of rates  PROJECT STATISTICS Initial 9 month development contract of 3,066m  KEY MILESTONES (to date) Commenced contract 26 November 2020 KEY PLANT & EQUIPMENT 2 x DD421 Sandvik Jumbos 2 x 621 Sandvik Loaders

Gwalia Deep – 2020

Posted · Add Comment

SCOPE Rehabilitation of old work areas  CONTRACT TYPE Fixed  PROJECT STATISTICS Project Term: 5 months initially  KEY MILESTONES (to date) Injury free to date KEY PLANT & EQUIPMENT 1 x Sandvik DD421 Jumbo

Black Rock Project

Black Rock – 2021

Posted · Add Comment

SCOPE Development – 1,600 metres of level and decline development Production – 1.6M tonnes of stope ore trucked to surface ROM CONTRACT TYPE Fixed and variable PROJECT STATISTICS Project Term: 30 months Employees: 60 at peak KEY MILESTONES (to date) Commencement: 1 January 2021 At completion of the development metres, Black Rock mine will be […]

Hamlet North – 2019

Posted · Add Comment

SCOPE 8796 metres of decline, incline, and level development CONTRACT TYPE Schedule of Rates PROJECT STATISTICS Project term: 24 months Employees: 60+ at peak production KEY MILESTONES (to date) Commencement 1 July 2019 Hamlet North will be developed from the Hamlet decline 2019 to 2021 Hamlet underground to operate concurrently in 2019 KEY PLANT AND […]

Cowal Gold Operations – 2019

Posted · Add Comment

SCOPE Portal development Decline development Level development Diamond drilling CONTRACT TYPE Schedule of rates PROJECT STATISTICS Project term: 12 months Employees: 37 PROJECT KEY OUTCOMES (to date) Develop portal face, exploration decline, level development, and diamond drilling over a 12 month contract period KEY MILESTONES (to date) Project commenced: 1 March, 2019 KEY PLANT & EQUIPMENT 1 […]

Carrapateena – 2018

Posted · Add Comment

SCOPE Raise bore services for ventilation shafts  from 100 to 500m and up to diameters of 5.5m diameter Shaft lining services as required CONTRACT TYPE Fixed and Variable / Schedule of Rates PROJECT STATISTICS Project term: ongoing KEY PLANT & EQUIPMENT 3 x raise bores: RBR600, RBR400, SBM800, SBM450

Thalanga – Far West – 2018

Posted · Add Comment

SCOPE Box cut excavation of Far West portal via drill and blast methods managing a two subcontractor Ground support of box cut with shotcrete and jumbo with PYBAR employees and equipment  CONTRACT TYPE Fixed and variable  PROJECT STATISTICS Project Term: 1-2 Months Employees: <16 people  KEY MILESTONES (to date) Firing of the box cut completed […]

 